CHAPTER 01 · ANNEX 1 PRODOC ARCHITECTURE
Platform Scope & Four Coastal Seascapes
This Enterprise Resource Planning (ERP) and Public Financial Management (PFM) console operationalizes the GEF-7 project Natural Capital Values of Coastal and Marine Ecosystems in Sri Lanka Integrated into Sustainable Development Planning (GEF ID: 10552; Full-Sized Project; 48-month duration; GEF STAR Grant USD 2,656,194).
The Ministry of Environment (MoE) serves as the Lead Implementing Partner and Chair of the National Steering Committee, collaborating with the Central Bank of Sri Lanka (CBSL), Department of Census and Statistics (DCS), IUCN Sri Lanka, and the Forum for Ecosystem Management and Advocacy (FEMA).
Geographic Scope — 667,056 ha across 4 Provinces & 16 Divisional Secretariat Divisions (DSDs):
- Puttalam Lagoon & Barrier Estuary (294,822 ha): Puttalam, Kalpitiya, Mundel, Vanathavillu DSDs. Key assets: 37,610 ha lagoon, 24,068 ha seagrass, 6,314 ha coral reef, 1,741 ha mangroves, 4,476 ha aquaculture.
- Madu Ganga – Hikkaduwa (36,315 ha): Hikkaduwa, Ambalangoda, Balapitiya, Gonapeenuwala, Karandeniya DSDs (Wet Zone). Key assets: 11,007 ha home gardens, 7,667 ha cinnamon, 1,339 ha lagoon, 239 ha mangroves.
- South-East Palk Bay, Mannar (122,150 ha): Mannar Town, Mantai West DSDs. Key assets: 24,677 ha seagrass, 5,707 ha sand dunes, 2,288 ha shoreline mangroves (Vidattaltivu), 2,227 ha coral reefs.
- Trincomalee Coastal Seascape (213,769 ha): Kinniya, Kuchchaveli, Muttur, Thambalagamuwa, Trincomalee Town & Gravets DSDs. Key assets: 42,682 ha forest, 27,554 ha paddy, 8,714 ha bay, 2,329 ha coral reef, 1,961 ha mangroves.
Use the Active Seascape Scope dropdown in the header at any time to filter EVM indices, WBS activities, voucher ledgers, procurement packages, and SEEA-EA Supply and Use Tables to a single seascape or roll up to the National view.
CHAPTER 02 · GOVERNANCE & ACCESS CONTROL
Workspace Role Toggles & Audit Security
To prevent unauthorized financial postings or unverified schedule mutations, the workspace enforces strict Role-Based Access Control (RBAC). Switch roles via the header selector to test each operational persona:
| Role |
WBS / Gantt |
GTM Vouchers |
Procurement |
SEEA-PES & Export |
| Project Director (MoE) |
Full Read / Write |
Post & FR 394 Approve |
Log & Update |
Full + Backup / Reset |
| Treasury / Finance Officer |
Read-Only |
Post & FR 135 Certify |
View Compliance |
CIGAS CSV & Donor Burn |
| Field Coordinator |
Add & Update Tasks |
Read-Only |
Read-Only |
Simulate PES & SUTs |
| Auditor / Oversight (IUCN/GEF) |
Read-Only |
Read-Only |
Audit Matrix |
Full Audit Log & Export |
Every state-changing operation stamps the active role, UTC timestamp, and reference ID into the immutable Audit Trail (Tab 5).
CHAPTER 03 · SOP-01 PROJECT CONTROLS
Managing the 4-Level WBS, Gantt & EVM Dashboard
The WBS follows the GEF-7 Project Document hierarchy: Level 1 (Component) → Level 2 (Outcome) → Level 3 (Output) → Level 4 (Activity / Deliverable).
- Adding or Updating a Task: Click Add WBS Task (or Edit on any Level-4 row). Enter a valid hierarchical WBS code (e.g.,
1.2.3.3), select the target Seascape and Owner Agency, enter Budget at Completion (BAC) in USD, Earned Progress (%), Actual Cost (AC), Status, and Start/End dates.
- Earned Value Calculations: On save, the engine automatically aggregates bottom-up from Level 4 to Levels 1–3 and recomputes:
EV (Earned Value) = BAC × (% Complete / 100)
PV (Planned Value) based on elapsed timeline against Reporting Period Y2Q4 (Month 24)
SPI = EV / PV (Schedule Performance Index; ≥ 1.00 is on/ahead of schedule)
CPI = EV / AC (Cost Performance Index; ≥ 1.00 is within/under budget)
- Gantt & S-Curve Sync: Both the 16-quarter Gantt bar chart and the cumulative S-Curve chart refresh immediately upon saving.
CHAPTER 04 · SOP-02 TREASURY & FINANCIAL REGULATIONS
Head 160-02-04 Accounting & FR 135 / FR 394 Compliance
All project funds are accounted under Government of Sri Lanka Parliamentary Appropriation Head 160-02-04 (Ministry of Environment), segregated into two financing codes:
- Financing Source 11 (GOSL Consolidated Fund / In-Kind): Domestic recurrent/capital counterpart allocations across MoE and line agencies.
- Financing Source 12 (Foreign Grants — GEF STAR): USD 2,656,194 external grant channeled via Treasury Operations Department (TOD) Imprest releases into Bank of Ceylon Project Current Account #704210.
Mandatory Sri Lanka Financial Regulations Enforcement:
- FR 135 Certification: Before payment, the Certifying Officer must verify that funds are lawfully provided in the relevant Economic Object Code (
1001–2501), goods/services have been satisfactorily rendered, and calculations are accurate.
- FR 394 Authorization: The Authorizing Officer (Accounting Officer / delegated Project Director) signs off on expenditure authority prior to cheque or SLIPS release from Account #704210.
- Automated Vote & Cash Guard: The Post Payment Voucher modal blocks any transaction missing FR 135/394 certification, exceeding the Object Code Vote Balance, or exceeding available Imprest cash in BoC #704210.
To reconcile with Treasury CIGAS, open Tab 5 and click Export CIGAS CSV.
CHAPTER 05 · SOP-03 PROCUREMENT GOVERNANCE
Dual Compliance: GOSL NPG 2006 vs IUCN / GEF Thresholds
Every contract package must satisfy both domestic public procurement law (National Procurement Guidelines 2006) and donor fiduciary oversight (IUCN / GEF Prior Review thresholds):
- Click Log Contract Package on Tab 3 to register a new procurement or update an existing package’s status.
- Enter the category, procurement method (NCB, ICB, QCBS, Shopping, IC, Direct), and contract value in USD.
- The system automatically evaluates whether IUCN / GEF Prior Review & No-Objection Letter (NOL) is triggered (e.g., ≥ USD 100,000 for Goods/Firms, ≥ USD 250,000 for Works, ≥ USD 50,000 for Individual Consultants, or any Direct Contracting).
- Always record the GOSL approving authority (DPC, MPC, CAPC) alongside the IUCN NOL status before moving a package to Awarded.
CHAPTER 06 · SOP-04 NATURAL CAPITAL ACCOUNTING
SEEA-EA Supply & Use Tables & PES Revolving Simulator
Tab 4 bridges project finances with ecological outcomes in line with UN SEEA Ecosystem Accounting (SEEA-EA) and the CBSL Sustainable Finance Roadmap:
- Multi-Donor Burn-Rate: Monitors the GEF STAR grant alongside 7 co-financing line agencies (MoE, DWC, FD, CC&CRMD, MEPA, SLTDA, LUPPD/Universities).
- SEEA Supply & Use Tables (SUT): Translates Annex 1 Table 3 habitat extents (Mangroves, Seagrass, Coral Reefs, Lagoons) into annual physical ecosystem service flows and monetary Gross Ecosystem Product (GEP) for national accounts (SNA) integration.
- PES Revolving Fund Simulator: Adjust tourism conservation surcharges, aquaculture lease fees, and blue carbon prices to model 5-year revolving conservation reserves and monthly livelihood stipends for the 300+ Small Fishers Federation (SFF) and community households.